If you are planning to take down or strip out a commercial building, one of the first questions is whether asbestos has to be dealt with first. In most older buildings, the honest answer is yes, it needs to be looked at before any demolition starts. This guide explains how asbestos abatement Toronto owners hire for fits into a commercial demolition timeline, what you should ask for, and where We-Haul fits in once the site is cleared.
We have been doing demolition and debris removal across the GTA since 2007, and we are a family-run company. We want to be plain about one thing up front: We-Haul does not survey for, remove or abate asbestos, and asbestos is a prohibited item in our bins. That work belongs to qualified specialists, and it happens before we start.
Why an Asbestos Survey Comes First
Asbestos was used in many building materials for decades, including some insulation, floor tiles, ceiling products and pipe wrap. You usually cannot tell by looking. Disturbing it during demolition can release fibres into the air, which is a risk to workers, neighbours and the people who later handle the debris.
According to the Ontario government’s guidance on asbestos in the workplace, the regulation covering asbestos on construction projects applies to demolition whether or not asbestos is known or suspected to be present. The same guide describes a general expectation that asbestos-containing material that may be disturbed during demolition is removed, to the extent practicable, before the work starts or continues. In short, you find out what is in the building first, and you deal with it first.
What Ontario Expects From the Building Owner
Ontario’s guidance explains that the Occupational Health and Safety Act requires the owner of a project to determine whether designated substances, asbestos among them, are present, and to prepare a list. That list is then given to the contractors who are bidding, before contracts are signed. The same guidance points owners toward qualified consultants for sampling and testing.
So the survey is not something your demolition contractor is meant to guess at. It is part of the owner’s preparation, and it is what lets every contractor price and plan the job on the same information. You can read the details directly on the Ontario government’s page, Asbestos in the workplace.
What Asbestos Abatement Toronto Projects Look Like
The exact steps depend on the building, but owners can generally expect this order of events:
- Survey and sampling. A qualified consultant inspects the areas that will be disturbed, samples suspect materials and reports what was found and where.
- Written results. You receive a report you can share with every contractor bidding on the work.
- Abatement where needed. A specialist abatement contractor removes affected materials using the controls the regulation requires. Ontario classifies this kind of work by risk level, with measures such as isolation enclosures, signage, training and protective equipment.
- Clearance. The area is confirmed ready for the next phase before demolition crews move in.
Each of these steps is handled by people trained and equipped for it, which is why we leave them to the specialists. A good consultant will explain the findings in plain language, and a good abatement contractor will tell you what has been removed and what remains, so that nothing is left to assumption when the demolition crew arrives.
Timelines for each step vary by building size and findings, so we will not put a number on them here. Ask your consultant for a schedule early, because it affects when demolition can begin.
Where Selective Demolition Fits
Many commercial jobs are not full teardowns. Selective demolition, where only certain walls, ceilings, floors or fixtures come out, is common for office fit-outs and tenant renovations. The survey rule still matters here. Ripping out a ceiling or a floor can disturb the very materials a survey is meant to identify, so a smaller job does not mean you skip the question.
If you are not sure what scope applies to your project, our guide to commercial demolition explained covers the main types, including interior office work, exterior commercial, partial and complete demolition.
What We-Haul Does Once the Site Is Cleared
Our process starts with a safety and hazard check of the site. After that we do a structural assessment of the surroundings, settle on the approach, and then clear the waste and recycle what we can. We salvage and recycle where possible and take the rest to the proper transfer stations.
If anything that looks like a suspect material turns up once work is underway, work in that area should stop until a qualified specialist has assessed it. That is one more reason to have a complete survey in hand before the job starts.
Other points owners ask about:
- A free bin rental is included with every demolition project.
- We handle permits. Commercial permit timelines vary by project and municipality.
- We are bonded and insured to $2M, WSIB-covered and registered with the Ontario Ministry of the Environment.
- We do not charge a fuel surcharge, environmental fee, same-day pickup upcharge, weekend delivery fee or hidden disposal fees.
For more on how the demolition side works, see our commercial demolition services in Toronto and our page on what demolition work looks like on a commercial job.
Questions to Ask Before You Hire Anyone
Whether you are hiring a consultant, an abatement contractor or a demolition company, these questions keep a project on track:
- Do you have a current survey report for the areas that will be disturbed?
- Who is responsible for abatement, and will I get written confirmation when it is complete?
- Is the designated substances list included in the information every bidder receives?
- What will the demolition contractor do if something unexpected turns up mid-job?
- Where will the debris go, and is any restricted material kept out of regular bins?
Choosing the right demolition company also matters. Our checklist on how to choose a demolition company in the GTA walks through insurance, WSIB, references and process.
Plan the Sequence, Then Call We-Haul
The safest order on a commercial job is survey first, abatement by specialists where needed, then demolition and debris removal. Getting asbestos abatement Toronto contractors booked early keeps the rest of your schedule from stalling. When the site is cleared and you are ready to talk about demolition, call us at 647-444-5865 or reach out through our contact page. Our office is at 4101 Steeles Ave W, Unit #210, North York.
This article is general information only and is not legal advice. Requirements depend on your building and project, so confirm them with a qualified consultant and the official Ontario sources before you start.